Projetu PDIM 2023 to’o 2026
Projetu PDIM 2023-2024
Lista Projetu PDIM 2023
| LISTA PROJETU 2023-2024 | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| NO. | DESKRISAUN PROJETU | TITIK KORDINAT | FATIN | KOMPANHIA | ORSAMENTU ($) | PROGRESU FISIKU (%) | PROGRESU PAGAMENTU % | BALANSU PROGRESU PAGAMENTU % | OBS | ||
| SUKU | POSTU | MUNISIPIU | |||||||||
| 1 | Rehabilitasaun Rezidensia para Apoio Programa Desentralizasaun | 125.566900° -8.731795° | Seloi Malere | Aileu Vila | Aileu | MARITIMI KROTEN.UNIP.LDA | $ 147,735.43 | 100.00% | 100.00% | Nihil | |
| 2 | Konstrusaun jardim Dom Baumeta inklui moru haleu iha suco Seloi Malere | 125.566427° -8.725861° | Seloi Malere | Aileu Vila | Aileu | FITUN FOUN.UNIP.LDA | $ 299,303.49 | 100.00% | 100.00% | Nihil | |
| 3 | Konstrusaun Be’e mos ho Sistema Bomba husi Be;e Matan mina morin ba Posto foun susekar | 125.665887° -8.717130° | Namoleso | Lequidoe | Aileu | HILBRA.UNIP.LDA | $ 48,608.72 | 100.00% | 100.00% | Nihil | |
| 4 | Rehabilitasaun Salaun Timor Klaran Inklui ho Jardim Inklui Moru Haleu | 125.565645° -8.726278° | Seloi Malere | Aileu Vila | Aileu | JOHIJEMAR.UNIP.LDA | $ 158,436.68 | 100.00% | 100.00% | Nihil | |
| 5 | Rehabilitasaun Rezidensia ADM Municipo Aileu | 125.566682° -8.730824° | Seloi Malere | Aileu Vila | Aileu | QIVAN.UNIP.LDA | $ 49,433.29 | 100.00% | 100.00% | Nihil | |
| 6 | Konstrusaun jardim sabraka laran inklu moru haleu | 125.566641° -8.731440° | Seloi Malere | Aileu Vila | Aileu | MIGLEN.UNIP.LDA | $ 189,381.34 | 100.00% | 100.00% | Nihil | |
| 7 | Konstrusaun Fatin Lixo Raelete Bandudato | 125.563180° -8.771874° | Bandudato | Aileu Vila | Aileu | GENEROSO UNIP.LDA | $ 70,441.70 | 100.00% | 100.00% | Nihil | |
| TOTAL | $ 963,340.65 | 100.00% | 100.00% | ||||||||
Projetu PDIM Poupansa 2024
| NO. | DESKRISAUN PROJETO | TITIK KORDINAT | FATIN | KONTRAKTOR | VALOR KONTRATU | PROGRESU FIZIKU (%) | BALANSU PROGRESU FIZIKU (%) | PROGRESU PAGAMENTU % | OBS | ||
|---|---|---|---|---|---|---|---|---|---|---|---|
| SUKU | POSTU | MUNISIPIU | |||||||||
| 1 | Konstrusaun Salaun Multifungsi | 125.566446° -8.731272° | Seloi Malere | Aileu Vila | Aileu | MIROL RAEFUSU UNIP.LDA | $ 53,965.18 | 100.00% | 100.00% | 100.00% | Nihil |
| 2 | Rehabilitasaun Posto Administrativo Laulara | 125.565645° -8.726278° | Kotolau | Laulara | Aileu | ANOSEL.UNIP.LDA | $ 15,781.21 | 100.00% | 100.00% | 100.00% | Nihil |
| 3 | Konstrusaun Moru haleu Rezidensia Presidenti Autoridade Munisipiu Aileu | 125.566832° -8.730660° | Seloi Malere | Aileu Vila | Aileu | KLUINFUN.UNIP.LDA | $ 61,034.94 | 100.00% | 100.00% | 100.00% | Nihil |
| 4 | Rehabilitasaun no Instalasaun Pompa Be'e Mos ba Paroquia São Pedro São Paulo Aileu | 125.564495° -8.733004° | Seloi Malere | Aileu Vila | Aileu | ESPADA NEGRA.LDA | $ 1,843.47 | 100.00% | 100.00% | 100.00% | Nihil |
| Total | $ 132,624.80 | 100.00% | 100.00% | 100.00% | |||||||
Lista Projetu 2025
| NO | A.M | SEKTOR | NARAN PROJEKTU | FATIN | TIPO PROJECTO | NO BENIFISIARIUS | KUSTO | KONDINAT | KONTRATO | PROGRESU FIZIKU (%) | BALANSU FISIK % | PAGAMENTU | BALANSU | JUSTIFIKASAUN | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| PA | SUKU | ALDEIA | F | M | LIVRO 3 | BOQ | VALOR KONTRATU | POUPANSA | LATITUDE | LONGITUDE | KOMPAHIA | NO | DATA SELEBRA | DATA TERMINA | ($) | (%) | ( $ ) | (%) | ||||||||
| 1 | AILEU | Obras Publika | Konstrusaun Bareira satan mota ba Eskola, Mercado no komunidade Loklamilu | Remexio | Acumau | Lokmailulu | Konstrusaun | 1.535 | 1.684 | $ 121,677.87 | $ 117,200.59 | $ 4,477.28 | 8*36'58.68"S | 124*40'2.52"E | Kuilelo Unip.Lda | 02/MAE/AM-AIL/SMA/V/2025 | 02 Maio 2025 | 02 de Novembro 2025 | 80.00% | 20.00% | $ 93,760.47 | 80% | $ 23,440.12 | 20.00% | ||
| 2 | AILEU | Servisu Agrikultura | Rehabilitasaun Irigasaun no barazem protesaun 700 M ba natar Aslimhati | Aileu-Vila | Hoholau | Aslimhati | Rehabilitasaun | Natar 17 Hektares | $ 250,000.00 | $ 247,692.74 | $ 2,307.26 | 8*43'49.40"S | 125*27'48.45"E | Qivan Unip.Lda | 01/MAE/AM-AIL/SMA/V/2025 | 02 Maio 2025 | 02 de Novembro 2025 | 83.42% | 16.58% | $ 198,154.19 | 80% | $ 49,538.55 | 20.00% | |||
| 3 | AILEU | Servisu Saude | Konstrusaun Postu Saude iha suku Seloi Kraik | Aileu-Vila | Seloi Kraik | Lio | Konstrusaun | 955 | 2.231 | $ 129,995.06 | $ 128,871.25 | $ 1,123.81 | 8*42'33.96"S | 125*31'20.10"E | Mirol Raefusu Unip. Lda | 03/MAE/AM-AIL/SMA/V/2025 | 02 Maio 2025 | 02 de Novembro 2025 | 100.00% | 0.00% | $ 128,871.25 | 100% | - | 0.00% | Obra Lao Hela | |
| 4 | AILEU | Obras Publika | Konstrusaun Turismu iha Bee manas Faturilau | Lequidoe | Faturilau | Kaerema | Konstrusaun | 3.736 | 4.064 | $ 204,240.00 | $ 204,196.40 | $ 43.60 | 8*41'43.65"S | 125*47'4.63"E | Fitun Foun Unip.Lda | 04/MAE/AM-AIL/SMA/V/2025 | 13 de Junhu 2025 | 13 de Dezembro 2025 | 80.00% | 20.00% | $ 163,357.12 | 80% | $ 40,839.28 | 20.00% | ||
| 5 | AILEU | Servisu Saude | Konstrusaun Postu Saude iha Suku Bokolelo | Laulara | Bokolelo | Bokolelo | Konstrusaun | 458 | 517 | $ 129,853.48 | $ 128,921.42 | $ 932.06 | 8*37'13.17"S | 125*31'53.23"E | Anosel Unip. Lda | 05/MAE//AM-AIL/SMA/V/2025 | 02 Maio 2025 | 02 de Novembro 2025 | 100.00% | 0.00% | $ 128,921.42 | 100% | - | 0.00% | ||
| 6 | AILEU | Obras Publika | Konstrusaun Bareira Satan Rai ba Edifisiu APA Lequidoe | Lequidoe | Namolesu | Serema | Konstrusaun | 3.736 | 4.064 | $ 122,000.00 | $ 120,989.37 | $ 1,010.63 | 8*42'57.83"S | 125*39'59.73"E | Northland Unip. Lda | 04/MAE/AM-AIL/SMA/V/2025 | 02 Maio 2025 | 02 de Novembro 2025 | 100.00% | 0.00% | $ 120,989.37 | 100% | - | 0.00% | Obra Finaliza Ona Iha inisiu Dezembro | |
| TOTAL | 195,105 | - | $ 957,766.41 | $ 947,871.77 | $ 9,894.64 | 90.57% | 9.43% | $ 834,053.82 | 90.00% | $ 113,817.95 | 10.00% | |||||||||||||||